engineering projects : transportation

Town of Pembroke Park
sw 52nd Ave Roadway & drainage

The project consisted of approximately 2,400 linear feet of new roadway (south of Hallandale Beach Boulevard), 2,200 linear feet of 36” HDPE pipe and exfiltration trench and 14 inlets. The project was funded through a CDBG grant for $844,200.

Broward County
McNab Road Improvements

The one-mile stretch of roadway, from University Drive to Pine Island Road, not only included the reconfiguration of the existing roadway but also consisted of approximately 4,700 LF of pipe culverts, approximately 5,600 LF of exfiltration trench with manholes and inlets, sidewalks, traffic signalization, striping and signage, landscaping, irrigation and street lighting.