construction management projects highlights

Spring Lake Improvement District
Stormwater Master Plan

The primary objective of the project was to develop a comprehensive Stormwater Master Plan for Spring Lake Improvement District. As part of the Master Plan, CAS prepared a Plan of Water Reclamation, modeled the conveyance system, identified system deficiencies, made recommendations for improvements and updated construction cost estimates for the proposed stormwater improvements.

Town of Pembroke Park
sw 52nd Ave Roadway & drainage

The project consisted of approximately 2,400 linear feet of new roadway (south of Hallandale Beach Boulevard), 2,200 linear feet of 36” HDPE pipe and exfiltration trench and 14 inlets. The project was funded through a CDBG grant for $844,200.

City of Sweetwater
Stormwater & Pumpstation Improvements

Both projects consist of a stormwater collection system that converges into a duplex pumping station (28 HP @ 6,048 GPM). The runoff is then discharged, via a shared force main, with an outfall at the SFWMD C-4 Canal.